Two shed buildings totaling 16,000 m², in addition to a hazardous shed, fuel station, and substation. Scope: Civil, Architectural, Steel Structure and MEP works Detailed Scope: • Foundation works, structural steel erection, roofing, and wall cladding. • Heavy-duty flooring and industrial-grade electrical installations. • Comprehensive mechanical, electrical, and plumbing systems. • External site development including roadworks and drainage.